Friday, January 22, 2010

Almost 28 Weeks!!!!!

Ah, another month almost done for BSG FPB. Boo! Time is flying way too much. And I don't like it. At least, I don't like it when it concerns my knitting or how quickly my pregnancy is going by! However, I was able to get one RR done so far with another one started.

I was able to complete Crystal's Matching Hat. It was an easy knit. I made it to match her daughter's hat and made a small 2x2 rib for the bottom instead of the ruffle. I kept the enlarging part at the top until it fit my own head. I roughly measured it out and figured 17 repeats of the pattern would give me 137 stitches total and then I did stockinette stitch for 5 inches. Then I was able to complete 8 rows of the 2x2 rib. I was able to finish with about 4 inches of yarn to spare! Woohoo! I was afraid I'd need another skein to finish hers, but I didn't have to bother. That made me happy!

I was talking with Jess the other day, when I was getting my glucose test done (and I passed, YAY). She absolutely loved her gloves and wears them everywhere. She also told me that her mom kept trying to steal them. So I offered to make a pair for her mom. She instantly took me up on the offer! Woohoo. So I purchased the yarn on Tuesday night when I was The Knitter's Edge. It's a light bluish-gray with a bit of purple. She even offered to pay me. So based on the amount the yarn cost me and a small work fee because it's Jess, I told her about $35 and she was completely cool with that. I told her to hold onto it until I got them done. I'd like to finish them for the Water RR by January 30, but my realistic goal is February 5. I'll have to post a photo later when I take a photo of how it's coming out.

Another thing I have been working on is my list of knits I'd like to make in the upcoming months. I even put it into an excel spreadsheet and uploaded to the google documents set. I've got a bunch I'll be making for my BBC girls from my Lil' Jelly Beans group. I hope they decide to send me their addresses or else I'll have to tell them all that I'm making them things (and Hannah, if you're reading this, keep your mouth shut ;) because I want it to be a surprise!). We have the ravelympics coming up that coincide with the Winter Olympics. I'm going to see if I can get all the items knitted between February 12-28. It's a big commitment but I think I'll be able to do it. I just hope I don't end up sick again. It seems that every time I plan on getting a lot of knitting done, it happens. Boo!
But Peanut's doing great. She's definitely a she, as we found out on Tuesday again. She's been an active little nut too. I can't believe I'm already in my third trimester. It's been going so fast. I'm just excited that Dad and DH are helping to paint the nursery. I can't wait until we get it all set up. I just cannot wait. Weee!

Monday, January 11, 2010

January Knits!

It’s been a long few weeks. I was able to relax recently, but that’s been because I’ve been sick. I’ve had an upper respiratory infection that turned into a horrible cough/pneumonia. I was put on bed rest for 5 days and will be having two half days at work the next two days. I’m still a bit weak but getting much better after being put on the Z-pack antibiotic. Peanut’s still k
icking like crazy and moving and shaking. Her new thing has been to stick her butt out on the right side of my belly. It’s quite amusing and comical.

As for knitting, I was able to get a bunch of things done in November and early December. First, I finally finished Crystal’s baby blanket for Hannah. It’s only 9 months late, but it’s done. I was going to give it to her over New Years, but I was sick and didn’t go out.



She had also asked me to make a new hat for Hannah with the same hat as I made for the Jester Hat way back when. I completed that in one day right before I got sick. She also requested that I make a matching one for her, but I’m still working on that. That’s what I get for being sick for two weeks!


For the FPB, I was able to complete my Cylon socks. They ROCK! I love how they turned out. And they’re very warm.



Also, I completed Jess’ winter gloves. They are very warm and she was able to try them on and LOVES them. I just hope she’s able to get good use out of them.


We had a swap for the FPB. I made the parts for my partner’s teapot, but didn’t put them all together. I didn’t know the exact measurements so I sent the parts to her and she completed the cozy. I stole some photos from her to post!



I also got some awesome yarn for “My Vampire Boyfriend Socks” that I will be completing hopefully this month.



Once all this is done, I have 7 baby hats to quick knit up for friends. Then, it’s all Peanut knitting. I have also decided to take up on my BBC friend, Hannah’s, enthusiasm to quilt and make Peanut’s bedding. I can’t wait to start on the nursery too. I have to pick out new carpet, paint, and fabric. I think that’s all for now. Hopefully I’ll be more chatty in the next few months. We have another appointment for Peanut next Tuesday. We’ll be verifying her sex again as well as a typical checkup. I can’t believe I’m already 26 weeks pregnant and we have less than 100 days until she makes her debut (that’s if she comes on time!)!!!!!